How to reproduce
- Go to the demo : https://demo.ametys.org/nightly-intranet-cms/intranet/index.html
- Put a publication date on a page that has content. Example: (10/01/2023) https://demo.ametys.org/nightly-intranet-cms/preview/intranet/fr/mon-organisation/l-institution.html
- copy the page
- paste the page
- validate content
After pasting I tell myself that I don't need to touch the scheduled publication or consult it to check, I can see that the information of the date of depublication has been pasted, then I click on cancel to exit.
If I go to the CMS admin "Exploitation > Planificateur de tâche", I can see that no unpublish task has been created for the copied page
To avoid this problem, after doing the pasting. You must consult the scheduled publication of the page via the dedicated button then click on "OK" without this manipulation the unpublication task will not be created
[CMS-11492] Copy/paste a page with a scheduled post
Status | Original: Resolved [ 5 ] | New: Closed [ 6 ] |
Resolution | New: Fixed [ 1 ] | |
Status | Original: Ready to merge [ 10208 ] | New: Resolved [ 5 ] |
Fix Version/s | New: 4.8.0 [ 17990 ] | |
Fix Version/s | New: 4.7.1 [ 17991 ] | |
Fix Version/s | Original: 4.7.0 [ 17704 ] |
Rank | New: Ranked higher |
Status | Original: Code review OK [ 10206 ] | New: Ready to merge [ 10208 ] |
Status | Original: Available for review [ 10005 ] | New: Code review OK [ 10206 ] |
Status | Original: In Progress [ 3 ] | New: Available for review [ 10005 ] |
Assignee | New: Loïc Bouchet [ lbouchet ] | |
Status | Original: Functional review OK [ 10207 ] | New: In Progress [ 3 ] |
Status | Original: Available for review [ 10005 ] | New: Functional review OK [ 10207 ] |
Status | Original: Open [ 1 ] | New: Available for review [ 10005 ] |